Stage 02 of 04 · Design

A design every supplier can build to

Workflows and models, the platform and compute beneath them, and the power, cooling and space to run it all, designed as one system and documented so it can be procured, built and tested

  1. 01Advise
  2. 02Design
  3. 03Deliver
  4. 04Coordinate

When to engage

  • You have an approved plan and need an architecture
  • You want models from several providers to work as one workflow
  • You are preparing a tender for compute, storage or network
  • Your facility must be adapted for high-density compute
  • You want an independent review of a supplier’s proposed design

Overview

Design: system and solution architecture

A GPU purchase without the right fabric, storage or cooling leaves capacity stranded, and the gap is usually found after installation.

We design all layers against one workload profile and record the basis of design, which suppliers, contractors and your own teams then work to.

What is included

What the stage covers

Workflows and models

Where AI does the work, and which models do it.

  • Workflow design: which step uses which model, and where people review
  • Models chosen task by task, across providers
  • Orchestration, evaluation and monitoring across models

Compute, network, storage and platform

The IT architecture, sized to the workloads it has to serve.

  • Cluster architecture for training, inference or HPC
  • High-speed interconnect and network fabric design
  • Storage tiers and parallel file systems
  • Platform: scheduling, orchestration, monitoring and security

Power, cooling and space requirements

What the facility has to deliver for the IT to perform.

  • Rack densities and load profiles
  • Air, direct-to-chip liquid and hybrid cooling options
  • Power distribution and resilience
  • Floor layout, weight loading and cable routes

Specifications and tender documents

Documents that let suppliers compete fairly and let you hold them to account.

  • Specifications written to performance and interfaces, without naming products
  • Bills of quantities and compliance matrices
  • Evaluation criteria and scoring method
  • Acceptance tests defined before procurement

What you receive

Deliverables

Documents you own. They are written to be read by your board and your engineers, and to be handed to any supplier.

01

Solution architecture

Each layer of the system and how the layers connect, with the design decisions and their reasons.

02

Facility requirements

The power, cooling, space and connectivity the design needs, as a brief for your engineers or data-centre operator.

03

Specification and tender pack

Technical requirements, compliance matrix and evaluation criteria.

04

Acceptance test plan

The tests the finished system must pass, agreed before anything is bought.

How it runs

Four steps

  1. 1

    Baseline

    Requirements confirmed from the advisory stage or from your own brief.

  2. 2

    Concept

    Architecture options are developed and compared, and one is agreed.

  3. 3

    Detail

    Each layer is designed in full, with the facility requirements and interfaces defined.

  4. 4

    Specify

    Specifications, tender documents and acceptance tests are issued.

Timelines depend on scope and are confirmed after the first conversation.

FAQ

Common questions

Do you recommend a particular AI model?

No. We compare models on your tasks and your data, and often recommend several, each where it performs best.

Will your design favour a particular vendor?

No. We specify performance, interfaces and acceptance criteria, and name products only where you require it. Tenders are scored against your requirements.

Can you review a design another party has proposed?

Yes. A design review checks a proposal against your workloads, facility and budget, and lists the gaps and risks with recommended changes.

Do you design the building services as well?

We define the IT load, densities and cooling approach the facility must support, and work with your mechanical and electrical engineers or the data-centre operator on the facility design.

Which standards do you design to?

Those the project requires, including the regulations that apply where it is built. They are recorded in a basis-of-design document that all parties work to.

Contact

Planning an architecture or a tender?

Tell us what you are planning and where you are today. The first conversation covers workloads, facilities and timing.